CALLS FOR TENDERS

Ser

No.

CD  No.

Legal

Subject

Bid Bond

Closing Date

S.P

1

43/2009

43/2009

Supply Mortar /First time/

30000

450

22/3/2010

2

2/2010

2/2010

  Supply Spare Parts for Mixed Fire Fighting Vehicles delivered by   KIDDE  ITALIA    SPA/SILVANI /First time/

346500

5250

25/3/2010

3

10/2009

10/2009

Supply Effluent Water Flow Meter /First time/

50000

850

30/3/2010

4

35/2009

35/2009

Supply /5/ Tons of Trisodium Phosphate Anhydrous /First time/

100000

1500

28/3/2010

5

1/2010

1/2010

Supply of Centrifugal Pumps /First time/

425000

6500

1/4/2010

6

40/2009

40/2009

Developing Hydraulic Decoking System from Coke Drums in Delayed Coking Unit in the H R C /First time/

3000000

43500

6/4/2010

7

37/2009

37/2009

Repair  Elec. Motors /6K.V / /Second times/

200000

3000

15/3/2010

8

3/2010

3/2010

Supply Flow Meters/First Time/

50000

750

7/4/2010

9

30/2009

30/2009

Supply of /55/ ±10% Tons Octane Booster for Gasoline (M.M.T)/First Time/

5132000

79000

8/4/2010

10

15/2009

15/2009

Supply of Fire Fighting Hose/First Time/

100000

1700

12/4/2010

11

4/2008

4/2008

Calibrating Spherical Tanks and Installing Radar Level Gauging System /First Time/

520000

8000

20/4/2010

12

7/2010

7/2010

Supply Mechanical Level Gauge for some Moving Tanks /First Time/

150000

2300

19/4/2010

13

27/2008

27/2008

Supplying , Installing , Testing and Operating of Electrical  Elevator for Persons load /1/ Tons /First Time/

850000

12000

21/4/2010

14

3/2009

3/2009

Supply Gear Unit with Accessories /Second Time/

1200000

19000

1/4/2010

15

4/2010

4/2010

Supply ,Install and Operate the Main Feeders Output Transformers (0.4) K V at the Sub -Stations ( 51.1) -(51.2) - (51.8) /First Time/

1000000

15400

24/4/2010

16

38/2009

38/2009

Supply /2/ Tons of Amine Antifoam /Second Time/

20000

300

23/4/2010

17

9/2010

9/2010

Supply Brick  /First Time/

10000

160

10/5/2010

18

29/2009

29/2009

Supply of Furnace Tubes/Second Time/

175000

2700

11/5/2010

19

8/2010

8/2010

Supplying , Installing and Operating complete Oxygen Analyzers for furnace's Flues of some Process Units in the Refinery /First Time/

1250000

19000

12/5/2010

20

12/2010

12/2010

Supplying Electric Motors (A.C.Motors) Low Voltage  /First Time/

100000

1500

16/5/2010

21

5/2010

5/2010

Supply and Installation of Vibration and Axial Displacement Measuring and Monitoring System for Steam Turbines  /First Time/

600000

9500

18/5/2010

Note: to see tech and Legal book click on highlighted CD. No