Ser
No. |
CD No. |
Legal |
Subject |
Bid Bond |
Closing Date |
|
S.P |
€ |
|
1 |
43/2009 |
43/2009 |
Supply Mortar
/First time/ |
30000 |
450 |
22/3/2010 |
|
2 |
2/2010 |
2/2010 |
Supply
Spare Parts for Mixed Fire Fighting Vehicles delivered by KIDDE
ITALIA SPA/SILVANI /First time/ |
346500 |
5250 |
25/3/2010 |
|
3 |
10/2009 |
10/2009 |
Supply
Effluent Water Flow Meter /First time/ |
50000 |
850 |
30/3/2010 |
|
4 |
35/2009 |
35/2009 |
Supply /5/
Tons of Trisodium Phosphate Anhydrous /First time/ |
100000 |
1500 |
28/3/2010 |
|
5 |
1/2010 |
1/2010 |
Supply of
Centrifugal Pumps /First time/ |
425000 |
6500 |
1/4/2010 |
|
6 |
40/2009 |
40/2009 |
Developing
Hydraulic Decoking System from Coke Drums in Delayed Coking Unit in the H R
C /First time/ |
3000000 |
43500 |
6/4/2010 |
|
7 |
37/2009 |
37/2009 |
Repair
Elec. Motors /6K.V / /Second times/ |
200000 |
3000 |
15/3/2010 |
|
8 |
3/2010 |
3/2010 |
Supply Flow
Meters/First Time/ |
50000 |
750 |
7/4/2010 |
|
9 |
30/2009 |
30/2009 |
Supply of /55/
±10% Tons Octane Booster for Gasoline (M.M.T)/First Time/ |
5132000 |
79000 |
8/4/2010 |
|
10 |
15/2009 |
15/2009 |
Supply of Fire
Fighting Hose/First Time/ |
100000 |
1700 |
12/4/2010 |
|
11 |
4/2008 |
4/2008 |
Calibrating
Spherical Tanks and Installing Radar Level Gauging System /First Time/ |
520000 |
8000 |
20/4/2010 |
|
12 |
7/2010 |
7/2010 |
Supply
Mechanical Level Gauge for some Moving Tanks /First Time/ |
150000 |
2300 |
19/4/2010 |
|
13 |
27/2008 |
27/2008 |
Supplying ,
Installing , Testing and Operating of Electrical Elevator for Persons
load /1/ Tons /First Time/ |
850000 |
12000 |
21/4/2010 |
|
14 |
3/2009 |
3/2009 |
Supply Gear
Unit with Accessories /Second Time/ |
1200000 |
19000 |
1/4/2010 |
|
15 |
4/2010 |
4/2010 |
Supply
,Install and Operate the Main Feeders Output Transformers (0.4) K V at the
Sub -Stations ( 51.1) -(51.2) - (51.8) /First Time/ |
1000000 |
15400 |
24/4/2010 |
|
16 |
38/2009 |
38/2009 |
Supply /2/
Tons of Amine Antifoam /Second Time/ |
20000 |
300 |
23/4/2010 |
|
17 |
9/2010 |
9/2010 |
Supply Brick
/First Time/ |
10000 |
160 |
10/5/2010 |
|
18 |
29/2009 |
29/2009 |
Supply of
Furnace Tubes/Second Time/ |
175000 |
2700 |
11/5/2010 |
|
19 |
8/2010 |
8/2010 |
Supplying ,
Installing and Operating complete Oxygen Analyzers for furnace's Flues of
some Process Units in the Refinery /First Time/ |
1250000 |
19000 |
12/5/2010 |
|
20 |
12/2010 |
12/2010 |
Supplying
Electric Motors (A.C.Motors) Low Voltage /First Time/ |
100000 |
1500 |
16/5/2010 |
|
21 |
5/2010 |
5/2010 |
Supply and
Installation of Vibration and Axial Displacement Measuring and Monitoring
System for Steam Turbines /First Time/ |
600000 |
9500 |
18/5/2010 |